combined 10 ton condensing steam boilers

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :combined 10 ton condensing steam boilers
  • Supply Capacity : 10 units/month :combined 10 ton condensing steam boilers
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Waste Heat Recovery Methods And Technologies - Chemical

    Jan 01, 2013 · An economizer or APH for water-tube boilers is typically not attractive for units operating under 10 kg/cm 2 g or below 20 ton/h of steam production, nor any size boiler that will normally run at reduced capacity. For industrial boilers, dual installation using both an economizer and an APH is rarely economical or installed.Get Price

  • Lower Heating Value - an overview | ScienceDirect Topics

    The plant operates combining the production of steam and electric power with the capacity of 45 MWe and four boilers, producing steam at 48 bar, 420°C. The boilers are equipped with high-technology gas cleaning system to minimize the environmental impact of the waste combustion.Get Price

  • 2021 Government Heating & Cooling System Rebates

    Boilers: $10/MBH for new and replacement boilers with an input rating lower than 400 MBH Condensing water heaters : $5/MBH for ENERGY STAR certified replacement units Infrared tube heaters : $600 to $1,200 per unit for new and replacement units, depending on whether the unit is single-stage, dual-stage, or condensingGet Price

  • Steam Locomotives (USA): History, Types, Photos, Facts

    Dec 17, 2021 · This steam engine saw some 25,000 built over the course of its operating life-span. It was a compact, but respectable design that could fill a range of roles, from passenger service to switching chores. In the succeeding years ever-larger wheel arrangements were needed which featured larger boilers to produce more steam, and ultimately more power.Get Price

  • Top Boilers Suppliers and Manufacturers in the USA

    Dec 27, 2021 · Company Summaries. Hurst Boiler and Welding Company, in Coolidge, GA, manufactures vertical, tubed, low emission, hybrid condensing, solid fuel, and waste, biomass, wood, coal, gas, and oil-fired steam and hot water boilers.It also provides skid package boiler systems, parts, and service. Indeck Power Equipment, based in Wheeling, IL, offers steam …Get Price

  • Steam Locomotives (USA): History, Types, Photos, Facts

    Dec 17, 2021 · This steam engine saw some 25,000 built over the course of its operating life-span. It was a compact, but respectable design that could fill a range of roles, from passenger service to switching chores. In the succeeding years ever-larger wheel arrangements were needed which featured larger boilers to produce more steam, and ultimately more power.Get Price

  • Utility systems - processdesign

    Feb 21, 2016 · These other boilers superheat the steam to create a high pressure and high temperature steam stream. The steam is superheated past the dew point to account for heat loss in the pipelines. A portion of the high pressure steam is used for process heating in areas of the plant that require high temperatures.Get Price

  • 2018 NORTH CAROLINA STATE BUILDING CODE: ENERGY

    These requirements apply to boilers with rated input of 8,000,000 Btu/h or less that are not packaged boilers and to all packaged boilers. Minimum efficiency requirements for boilers cover all capacities of packaged boilers. b. Maximum capacity – minimum and maximum ratings as provided for and allowed by the unit's controls.Get Price

  • POSITIONS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

    6th POSITION—BOILERS H Heating Oil N Natural Gas P Propane Gas COOLING CODE BTUH 000 None 014 14,000 018 18,000 024 24,000 Etc. 7-9th POSITION— COILS 018 1.5 ton 024 2 ton 030 2.5 ton Etc. MODEL CODE SIZE 001 First Size 002 Second Size 003 Third Size 004 Fourth Size UNIT OF EXAMPLE CAPACITY RECORD OF CODE None — 000 Heating Input MBtuh Get Price

  • Chapter 4: [CE] Commercial Energy Efficiency, Energy

    These requirements apply to boilers with rated input of 8,000,000 Btu/h or less that are not packaged boilers and to all packaged boilers. Minimum efficiency requirements for boilers cover all capacities of packaged boilers. Maximum capacity — minimum and maximum ratings as provided for and allowed by the unit's controls.Get Price

  • Lower Heating Value - an overview | ScienceDirect Topics

    The plant operates combining the production of steam and electric power with the capacity of 45 MWe and four boilers, producing steam at 48 bar, 420°C. The boilers are equipped with high-technology gas cleaning system to minimize the environmental impact of the waste combustion.Get Price

  • POSITIONS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

    6th POSITION—BOILERS H Heating Oil N Natural Gas P Propane Gas COOLING CODE BTUH 000 None 014 14,000 018 18,000 024 24,000 Etc. 7-9th POSITION— COILS 018 1.5 ton 024 2 ton 030 2.5 ton Etc. MODEL CODE SIZE 001 First Size 002 Second Size 003 Third Size 004 Fourth Size UNIT OF EXAMPLE CAPACITY RECORD OF CODE None — 000 Heating Input MBtuh Get Price

  • Engineering Handbook For Hazardous Waste Incineration

    The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C. Steam is generated at 25 atm and superheated to 250°C at a rate of 34 t/h. A steam turbine generates electric power at the rate of 1320 kw/h consuming 22 t/h steam.Get Price

  • Waste Heat Recovery Methods And Technologies - Chemical

    Jan 01, 2013 · An economizer or APH for water-tube boilers is typically not attractive for units operating under 10 kg/cm 2 g or below 20 ton/h of steam production, nor any size boiler that will normally run at reduced capacity. For industrial boilers, dual installation using both an economizer and an APH is rarely economical or installed.Get Price

  • Published AHRI Standards and Guides

    A steam boiler designed to operate at or below a steam pressure of 15 psig; or A hot water boiler designed to operate at or below a water pressure of 160 psig and a temperature of 250 °F; or A boiler that is designed to be capable of supplying either steam or hot water, and designed to operate under the conditions in Sections 2.1.1 and 2.1.2 Get Price

  • 2021 Government Heating & Cooling System Rebates

    Boilers: $10/MBH for new and replacement boilers with an input rating lower than 400 MBH Condensing water heaters : $5/MBH for ENERGY STAR certified replacement units Infrared tube heaters : $600 to $1,200 per unit for new and replacement units, depending on whether the unit is single-stage, dual-stage, or condensingGet Price

  • Engineering Handbook For Hazardous Waste Incineration

    The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C. Steam is generated at 25 atm and superheated to 250°C at a rate of 34 t/h. A steam turbine generates electric power at the rate of 1320 kw/h consuming 22 t/h steam.Get Price

  • Utility systems - processdesign

    Feb 21, 2016 · These other boilers superheat the steam to create a high pressure and high temperature steam stream. The steam is superheated past the dew point to account for heat loss in the pipelines. A portion of the high pressure steam is used for process heating in areas of the plant that require high temperatures.Get Price