industrial 300 bhp condensing hot water boiler
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Supplementary Problem In a hot water heating system, (compressor plus condenser) the water used for condensing is 55F and the evaporator is at 15F. Calculate the ideal COP. a) 11.875. c) 10.875. b) 12.875. /s of air at a static pressure of 2.54 cm of water through a duct 300. mm diameter and discharges it through duct of 275 mm diameter Get Price
The water leaves the boiler tube at 50 bar and 700oK at velocity of 150 m/s. Calculate the inlet vELOCITY (m/s) From steam tables: at 70 bar (7MPa) at 65oC v1 = 0.001017 m3/kg at 50 bar (5MPa) and 700oK (427oC) v2 = 0.06081 m3/kg. a. 1.56 b. 2.51 c. 1.672 d. 3.230 Steam leaves an industrial boiler at 827.4 kPa and 171.6 oC.Get Price
In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price
The water leaves the boiler tube at 50 bar and 700oK at velocity of 150 m/s. Calculate the inlet vELOCITY (m/s) From steam tables: at 70 bar (7MPa) at 65oC v1 = 0.001017 m3/kg at 50 bar (5MPa) and 700oK (427oC) v2 = 0.06081 m3/kg. a. 1.56 b. 2.51 c. 1.672 d. 3.230 Steam leaves an industrial boiler at 827.4 kPa and 171.6 oC.Get Price
Supplementary Problem In a hot water heating system, (compressor plus condenser) the water used for condensing is 55F and the evaporator is at 15F. Calculate the ideal COP. a) 11.875. c) 10.875. b) 12.875. /s of air at a static pressure of 2.54 cm of water through a duct 300. mm diameter and discharges it through duct of 275 mm diameter Get Price
Dryback boilers are available from 25 BHP to 1,000 BHP. Watertube Boilers: Victory Energy manufactures a full line of industrial watertube boilers. Suited for all industrial and institutional applications. Watertube boilers are available up to 500,000+ PPH.Get Price
The water leaves the boiler tube at 50 bar and 700oK at velocity of 150 m/s. Calculate the inlet vELOCITY (m/s) From steam tables: at 70 bar (7MPa) at 65oC v1 = 0.001017 m3/kg at 50 bar (5MPa) and 700oK (427oC) v2 = 0.06081 m3/kg. a. 1.56 b. 2.51 c. 1.672 d. 3.230 Steam leaves an industrial boiler at 827.4 kPa and 171.6 oC.Get Price
Hurst Boiler, Inc. is the leading manufacturer of gas, oil, wood, coal, solid fuel, solid waste, biomass and hybrid fuel-fired steam and hot water boilers. …Get Price
In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price
Hurst Boiler, Inc. is the leading manufacturer of gas, oil, wood, coal, solid fuel, solid waste, biomass and hybrid fuel-fired steam and hot water boilers. …Get Price
thus; Pwater = 21.22 Hp 21. Past ME Board Problem A boiler feed pump receives 45 li./s of water at 190°C and enthalpy of 839.33 kJ/kg. It operates against a head of 952 m with efficiency of 70%. Estimate the water leaving temperature assuming that the temperature rise is due to the inefficiency of the input energy. a. 190.96 °C c. 199.71 °CGet Price
Supplementary Problem In a hot water heating system, (compressor plus condenser) the water used for condensing is 55F and the evaporator is at 15F. Calculate the ideal COP. a) 11.875. c) 10.875. b) 12.875. /s of air at a static pressure of 2.54 cm of water through a duct 300. mm diameter and discharges it through duct of 275 mm diameter Get Price
Dryback boilers are available from 25 BHP to 1,000 BHP. Watertube Boilers: Victory Energy manufactures a full line of industrial watertube boilers. Suited for all industrial and institutional applications. Watertube boilers are available up to 500,000+ PPH.Get Price
In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price
Dryback boilers are available from 25 BHP to 1,000 BHP. Watertube Boilers: Victory Energy manufactures a full line of industrial watertube boilers. Suited for all industrial and institutional applications. Watertube boilers are available up to 500,000+ PPH.Get Price
thus; Pwater = 21.22 Hp 21. Past ME Board Problem A boiler feed pump receives 45 li./s of water at 190°C and enthalpy of 839.33 kJ/kg. It operates against a head of 952 m with efficiency of 70%. Estimate the water leaving temperature assuming that the temperature rise is due to the inefficiency of the input energy. a. 190.96 °C c. 199.71 °CGet Price
Hurst Boiler, Inc. is the leading manufacturer of gas, oil, wood, coal, solid fuel, solid waste, biomass and hybrid fuel-fired steam and hot water boilers. …Get Price
thus; Pwater = 21.22 Hp 21. Past ME Board Problem A boiler feed pump receives 45 li./s of water at 190°C and enthalpy of 839.33 kJ/kg. It operates against a head of 952 m with efficiency of 70%. Estimate the water leaving temperature assuming that the temperature rise is due to the inefficiency of the input energy. a. 190.96 °C c. 199.71 °CGet Price