combined 400 bhp water steam boilers
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price
Two Foster Wheeler Express "D"-type water-tube boilers supplied steam to GE 13,500 shp (10,070 kW) steam turbines and generators (9,200 kW). Electric motors for 12,000 shp (8,900 kW) drove the two shafts, each fitted with a three-bladed propeller of solid manganese-bronze that was 8 ft 6 in (2.59 m) in diameter.Get Price
In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price
Dec 19, 2020 · 380. Two boilers are operating steadily on 91,000 kg of coal contained in a bunker. One boiler is producing 1591 kg of steam per hour at 1.2 factor of evaporation and an efficiency of 65% and another boiler produced 1364 kg of steam per hour at 1.15 factor of evaporation and an efficiency of 60%.Get Price
Dec 28, 2021 · The Kilpilahti combined heat and power (CHP) project is a modernisation project that aims to replace two old boilers and two steam turbines from the existing power plant in the Kilpilahti industrial area in Porvoo, approximately 40km east of Helsinki, Finland.Get Price
A steam boiler on a test generates 885,000 lb of steam in a 4 hr period. The average steam pressure is 400 psia, the average steam temperature is 700 °F, and the average temperature of the feed water supplied to the boiler is 280 °F.Get Price
Dec 19, 2020 · 380. Two boilers are operating steadily on 91,000 kg of coal contained in a bunker. One boiler is producing 1591 kg of steam per hour at 1.2 factor of evaporation and an efficiency of 65% and another boiler produced 1364 kg of steam per hour at 1.15 factor of evaporation and an efficiency of 60%.Get Price
A steam boiler on a test generates 885,000 lb of steam in a 4 hr period. The average steam pressure is 400 psia, the average steam temperature is 700 °F, and the average temperature of the feed water supplied to the boiler is 280 °F.Get Price
Six Yarrow oil-fired water tube boilers supplied steam at 425 lb/psi and 725 degrees superheat. The main engines developed 30,000 shp on five boilers (leaving one in reserve) for a normal service speed of 21 knots.Get Price
Dec 28, 2021 · The Kilpilahti combined heat and power (CHP) project is a modernisation project that aims to replace two old boilers and two steam turbines from the existing power plant in the Kilpilahti industrial area in Porvoo, approximately 40km east of Helsinki, Finland.Get Price
Six Yarrow oil-fired water tube boilers supplied steam at 425 lb/psi and 725 degrees superheat. The main engines developed 30,000 shp on five boilers (leaving one in reserve) for a normal service speed of 21 knots.Get Price